Prev | Current Page 250 | Next

"The Plattsburg Manual A Handbook for Military Training"

The
supports would construct their trenches and the communicating trenches.
He would, if necessary, issue the necessary orders to protect the front
and flanks by sending out patrols. He would indicate how the position is
to be strengthened and make arrangements for distributing the extra
ammunition. If time is a serious consideration, the major would direct
the work to be done in the order of its importance, which is ordinarily
as follows:
(1) Clearing of foreground to improve the field of fire and construction
of fire trench.
(2) Head or overhead cover concealment.
(3) Placing obstacles and recording ranges.
(4) Cover trenches for supports and local reserves.
(5) Communicating trenches.
(6) Widening and deepening of trench; interior conveniences.
Now having cleared the foreground, dug the trenches, recorded ranges to
the important objects in each sector, etc., the position can be
occupied. The citizen ordinarily pictures the firing trench full of
soldiers when he is told the trenches are occupied.


Pages:
238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262